MS Project | SOLO/DUO
Offline 80.221.91.195:28015 checked 11d ago
Players
Every five minutes, from the Steam server list.
Hourly average and peak, UTC.
Daily average and peak, UTC.
Server performance
48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.
Rank
daily · 1 is bestTop 70% of all ranked servers. Ranked on player hours over the last seven days.
Wipe schedule
too few wipes seen yetNot enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.
The first 48 hours of its last wipes
Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.
Wipes
newest first| Wiped | Peak | Crowd | Lasted | Players before |
|---|---|---|---|---|
| Sat 26 Sep, 09:07 UTC17d ago | 1 | – | running | 1 |
| Thu 17 Sep, 20:03 UTC26d ago | 1 | halved by day 1 | 8.5 days | 0 |
Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.
Similar servers
The same kind of game, then region, group limit, rate and wipes.
Quick answers
From the figures on this page.
Lists and tags
What is the meaning of the tags on MS Project | SOLO/DUO?
The server browser reads these tags that MS Project | SOLO/DUO publishes: gmrust (Game mode): Survival as standard Rust plays; mp25 (Max players): 25 player slots; ts8 (Group limit): The default cap is 8 per team; v2633 (Protocol): You need protocol 2633 to join, matching your game version; cs162929 (Build): Game build: 162929; ptrak (Networking): Network runs on RakNet, the game's standard; $r? (Region code): The region code is left blank; ^z (Modded): It sits in Modded: plugins or settings make the difference; ^y (Carbon): The plugin framework here is Carbon. Player numbers, queue length and world age are tagged as well, and they sit at the top of this page.
On Rust Vending Machine, which lists and filters can you find MS Project | SOLO/DUO in?
These Rust Vending Machine lists include MS Project | SOLO/DUO: Modded Rust servers. These filters bring it up on the server list: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.
Map and rules
Which map is currently on MS Project | SOLO/DUO?
MS Project | SOLO/DUO runs a procedural map of size 3,500 with seed 789936933, generated by the game. The map is the same for a given size and seed, so RustMaps can show it from this page.
What rules does MS Project | SOLO/DUO enforce, and what settings does it run?
There is no gather rate in the name MS Project | SOLO/DUO. The group limit is 8 players, the game's default. You play survival, the usual game of gathering, building and raiding. Fighting and raiding between players is allowed. Plugins or settings change the game, so it is listed under Modded. Carbon plugins are running on it. VAC is on.
About the server
What location is MS Project | SOLO/DUO in?
You will find no region published for MS Project | SOLO/DUO. A server's stated location is what Rust Vending Machine shows; the actual machine location is not looked up. The endpoint is 80.221.91.195:28015.
What is the uptime like on MS Project | SOLO/DUO?
Right now MS Project | SOLO/DUO is not in stock, last seen 11 days 1 hours ago. Across the last 7 days, it was available for 0 of 168 hours, or 0% of the time. The first sighting of it on Rust Vending Machine was 13 September 2026.
What Rust version does MS Project | SOLO/DUO run?
On Linux, MS Project | SOLO/DUO is running Rust network protocol 2633 and build 162929. The protocol has to line up on your side to join, and Steam does the updating.
Population
How does MS Project | SOLO/DUO compare to other Rust servers in the rankings?
Over the last seven days MS Project | SOLO/DUO ranks #15,948 on player hours, among the top 70% of all ranked servers.
What is the current player count on MS Project | SOLO/DUO?
Current status for MS Project | SOLO/DUO: offline, last seen 11 days 1 hours ago.
Wipe info
When does MS Project | SOLO/DUO wipe?
Too few wipes of MS Project | SOLO/DUO are recorded to tell what its rhythm is. When the monthly force wipe arrives on Thursday 5 November at 19:00 UTC, every Rust server wipes. It has been running its current world since 17 days 12 hours ago.
What happens on MS Project | SOLO/DUO on wipe day?
At their busiest, its recent wipes averaged 1 players. The crowd on the latest wipe was at its largest 0 hours after the wipe. The crowd stayed above half that peak until the next wipe in 0% of its recent wipes. By day 1 the crowd had dropped below half in the wipes that failed to hold.
Getting in
What steps do you take to join MS Project | SOLO/DUO?
In the Rust console (F1), type client.connect 80.221.91.195:28015. You can also press Launch Rust on this page, which opens Steam and connects.
Server tags
what each one meansPublished as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y
Game
gmrust
mp25
ts8
v2633
cs162929
ptrak
$r?
Mods and access
^z
^y
Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.